How a Deck Is Built: The Stages From Ground Up

Last updated

The short answer

A deck is built by planning the height below the damp course, clearing and covering the ground with a membrane, setting footings, fixing bearers and joists at spacings that suit the boards, then laying boards with drainage gaps. Fascias, steps and a balustrade on raised decks finish it.

Official guidance: Planning Portal: decking

At a glance

Sets the height
Door threshold and damp course
Planning
Rules apply above 30cm
Lasts because of
Footings, frame and ventilation
Raised decks
Need a balustrade

A deck is a frame on footings with boards on top. Footings and frame decide how long it lasts, so most of the planning and effort goes into the parts you will never see.

Building a deck looks like a weekend job in videos, but the parts that matter are underneath: how it is supported, how the frame is spaced and how water and air move below the boards.

We design and build decking as one of our main services. This guide walks through a build in order so you know what a well made deck involves and what to look for in a quote.

Capital Fencing decking work illustrating how a deck is built: the stages from ground up

Planning the size and height

The deck height is usually set by the door threshold, staying below the damp proof course and leaving room for ventilation underneath. Raised decks need extra thought, because planning rules apply to decking more than 30cm above the ground.

Check the Planning Portal and your local council for your own situation before building high.

Preparing the ground

Turf and topsoil are cleared, the ground is levelled roughly and a weed membrane is laid, often under a layer of gravel. This reduces weeds and keeps the area under the deck tidy.

Footing holes and clearance can meet buried services, so locate cables and pipes before digging starts.

Footings

Posts or pads take the load to firm ground. Concrete footings at regular centres are common, while decks on existing concrete may use adjustable pedestals or bearers.

On soft ground or slopes, footings may need to go deeper to stay stable.

The frame and joists

Bearers sit on the footings and joists run across them at spacings that suit the board type. Composite boards usually need closer joist spacing than timber. Treated timber rated for ground contact is used for the frame.

Ventilation gaps around the edges stop moisture building up underneath.

Detail from a Capital Fencing job relating to how a deck is built: the stages from ground up

Laying the boards

Boards are fixed with screws or hidden clips, with small gaps between them for drainage and movement. Joints are staggered and supported by a joist under every end.

Edges, steps and balustrades

Fascia boards finish the edge and hide the frame. Steps need consistent rise and going so they are comfortable and safe. Raised decks need a balustrade to guard the edge, with gaps small enough for safety.

Building it yourself or hiring a team

Small, low decks on level ground are within reach of a confident DIYer. Raised decks, slopes, steps, balustrades and composite systems benefit from experience.

We visit, measure and give a written quote covering footings, frame, boards and finishing.

Choosing the board material

Softwood boards are the most economical and take stain well but need regular treatment. Hardwoods are denser, heavier and long lasting, with a rich colour that silvers if left untreated. Composite boards need little upkeep beyond cleaning and do not need staining, but they require closer joist spacing and specific fixings. The choice affects the frame as much as the finish.

Decks next to the house

A deck built against the house must not bridge the damp proof course or block air bricks, and a gap should be left so water can drain away. Ledger boards fixed to the wall need careful flashing and fixing, so many decks are built freestanding on their own footings instead.

Safety during the build

Footings involve digging, and power tools are used throughout. Any outdoor lighting or sockets built into the deck must be installed by a qualified electrician. Raised decks need edge protection while they are being built and a proper balustrade when finished.

Steps and changes of level

Steps from a raised deck need equal rises and a deep enough tread to feel safe, especially in wet weather. A wide bottom step or a landing helps where the deck meets the lawn. Where the garden slopes, two smaller deck levels joined by a step often look and work better than one tall platform.

Looking after a new deck

Timber decks benefit from a clean and fresh treatment each year or two, while composite boards need regular cleaning to stop dirt and algae building up. Keeping the gaps clear of debris lets water drain and air circulate under the boards, which helps the frame last.

Want a deck built properly?

Send photos and the height of your back door threshold. We will plan footings, frame and boards and give a written quote.

Frequently asked

Do I need planning permission for a deck?

Planning permission is usually needed if the decking is more than 30cm above the ground. Check the Planning Portal and your council.

How far apart should deck joists be?

It depends on the board type and thickness. Composite boards usually need closer spacing than timber, so follow the board maker's guidance.

Can decking be built on grass?

The grass should be cleared and a membrane laid first, with the deck on proper footings rather than directly on soil.

Do you build decks?

Yes. Decking is one of our main services, from low platforms to raised decks with steps and balustrades.

What is the best material for decking boards?

Softwood, hardwood and composite each suit different budgets and upkeep. We talk through them on a visit.

Keep reading

Get In Touch

Get My Free Quote — 24h Response

No callout fee · Photos first, written estimate · Friendly local team covering London & Hertfordshire.

Call us
07885907880
Email
petru@capital-fencing.co.uk
WhatsApp
Message us anytime
Area
London & Hertfordshire
Payment
Card payments accepted

Pay by debit or credit card, bank transfer or cash once the work and price are agreed. No deposit taken online.

Request a Free Quote

We'll get back to you within 24 hours.

Add photos of the area (optional)

Photos help us quote accurately without a delay. Short videos are welcome too. Photos up to 10MB each, videos up to 50MB each, up to 8 files.

Photos first, written estimate No Callout Fee
Call WhatsAppQuote