How it's done
How to Lay Porcelain Slabs Outdoors
Last updated
The short answer
Lay porcelain slabs on a compacted sub base with a full mortar bed, brushing a slurry primer onto the back of each slab just before laying so the mortar bonds to the dense surface. Cut with a wet diamond blade, check levels against neighbouring slabs and fill joints with a suitable compound.
At a glance
- Essential
- Slurry primer on every slab
- Bed
- Full mortar, no hollows
- Cutting
- Wet diamond blade
- Watch for
- Height differences between slabs
Porcelain is dense and does not absorb water, so it needs a full mortar bed with a bonding primer on the back of each slab. Without it, slabs can come loose.
Outdoor porcelain looks crisp, resists stains and needs little cleaning, which is why it has become popular for new patios. It is laid differently from natural stone because of how dense it is.
We lay porcelain as part of our patio and landscaping work. This guide explains the steps that are specific to porcelain, which are the ones most often skipped.

Why porcelain is different
Natural stone and concrete are porous, so mortar grips them as it soaks in. Porcelain hardly absorbs anything. Laid on ordinary mortar alone, slabs can release from the bed and start to rock or sound hollow.
That is why a bonding primer is used on every slab.
Levels and sub base
The same rules apply as for any patio: finish below the damp course, fall away from the house and build on a well compacted stone sub base. Porcelain slabs are thinner than many stone slabs, so the base has to be accurate.
Locate buried cables and pipes before excavating, especially near the house wall and outside taps.
Priming and bedding
A slurry primer is brushed onto the back of each slab immediately before it is laid onto a full bed of mortar. Every part of the slab is supported, with no hollows underneath.
Slabs are tapped down gently and checked against string lines and a level.
Cutting porcelain
Porcelain is hard and brittle, so it is cut with a diamond blade, usually wet to control dust and heat. Cuts are planned to keep small slivers away from visible edges.
Dry cutting produces fine dust that should not be breathed in, which is another reason this stage needs proper equipment.

Spacing and lippage
Even joints are kept with spacers. Because porcelain is so flat and often large format, small height differences between neighbouring slabs show clearly, so each one is checked against its neighbours.
Thin edges also chip if they are knocked, so levels are set carefully rather than forced.
Jointing
Joints are filled with a jointing compound or mortar suited to porcelain once the bed has set. Some compounds are brushed in, others pointed. Residue is cleaned off the surface promptly, before it can mark the glaze.
Getting it quoted
Porcelain patios reward careful preparation. We check the levels, base and drainage on a visit, then give a written quote covering excavation, base, priming, laying and jointing.
Choosing outdoor porcelain
Outdoor porcelain is thicker than indoor tiles, often around 20mm, and has a textured finish for grip in wet weather. Large format slabs look clean and modern but are heavier to handle and less forgiving of an uneven base. Colours range from pale greys to stone and wood effects. Choose the size and finish with the layout in mind, so cuts and joints fall neatly.
Matching porcelain inside and out
Some owners use porcelain that matches the kitchen or living room floor so the patio looks like a continuation of the room. Outdoor grade versions of the same design are needed for grip and frost resistance, and the patio still has to sit lower than the internal floor with a fall away from the house. A level threshold needs a drainage channel at the door.
Looking after a porcelain patio
Porcelain does not normally need sealing and resists most stains. Regular sweeping and an occasional wash with mild detergent keep it looking new. The joints are the part most likely to need attention over time, so check the jointing compound each spring and refill any gaps before weeds take hold.
Edges and steps in porcelain
Porcelain edges are crisp, so the outer slabs and any step treads need careful setting. Bullnose step pieces and matching coping are available for many ranges and give a finished look. Exposed edges are haunched with mortar so they cannot move, and steps need consistent heights so nobody trips at the change of level.
Common porcelain mistakes
Most failures come from skipping the primer, using dabs of mortar instead of a full bed, or building on a weak base. Using the wrong jointing product can also stain the surface. Fixing a loose porcelain slab later means lifting it, cleaning off the old bed and relaying it properly.
Want a porcelain patio?
Send photos and rough sizes of the area. We will check levels and drainage, then quote the base, priming and laying.
Frequently asked
Do porcelain slabs need a primer?
Yes. A slurry primer on the back of each slab helps the mortar bond to the dense porcelain surface.
Can porcelain be laid on sand?
No. It needs a full mortar bed on a compacted sub base to stay secure.
Is porcelain paving slippery?
Outdoor grade porcelain has a textured surface for grip. Indoor tiles should not be used outside.
Do you lay porcelain patios?
Yes. Patios, paving and porcelain are part of our landscaping work, quoted in writing after a visit.
How thick should outdoor porcelain be?
Outdoor porcelain paving is commonly around 20mm thick, which is thicker than indoor tiles.
